What is the Inventory of your Software Development project ?

 

Traditional software development follows a quintessential Waterfall model. Among its many limitations, originally discussed by Winston Royce in his 1970 classic paper “Managing the Development of Large Software Systems” and many more thereafter, it also forces a build-up of ‘work-in progress’, or inventory of unfinished work that has not yet been delivered to the customer, and even if it has been presented to the customer, it doesn’t add value until the final working software has been delivered. I define ‘value’ here as originally defined by Womack and Jones in their classic ‘Lean Thinking’, “…The critical starting point for lean thinking is value. Value can only be defined by the ultimate customer. And it’s only meaningful when expressed in terms of a specific product (a good or a service, and often both at once), which meets the customer’s needs at a specific price at a specific time”.  

 

Agile software development, as originally envisaged in the Agile Manifesto, aims to address several of the challenges faced in a Waterfall-type of software development by working on shorter delivery cycles using only a subset of requirements at a time. This subset of requirements (“Sprint Backlog” in Scrum) is prioritized by the customer or customer’s representative (“Product Owner”), so at the end of this short delivery cycle (“Sprint”), the customer gets ‘potentially shippable software’ having exactly those features that add ‘value’ to her. Frequent delivery of working software also has an additional impact on reducing ‘inventory’ levels in a software project, however, Agile doesn’t specifically address how is improves it over traditional software development. We can use concepts from Lean manufacturing to understand and explain inventory build-up in a software development, and how Agile practices help us manage them better compared to the traditional software development practices.

 

Little’s Law states that inventory in a process is the multiplication of throughput and the flow-time. In traditional manufacturing, there is a strong emphasis on plant capacity utilization as a core driver in cost management. However, a high plant capacity utilization requires (or rather leads to) high inventory to ensure the production doesn’t slow down for want of raw materials. High inventory in turn leads to a low inventory turnover, signifying poor sales, thus having high economic implications. Inventory is also identified as one of the seven wastes in Lean. I have discussed the concept of inventory in a typical manufacturing process and how Little’s Law can be used to analyze mathematical relationship between inventory, manufacturing lead time and cycle time in my article “Applying Little’s Law to Agile Project Management – part 1”.

 

In software development, inventory can be thought of as the development costs that continue to be incurred while the development activities are underway. Only when a successful delivery has been made and accepted by the customer, the development team can realize its developments costs, and free-up the ‘inventory’. Until such time, this ‘inventory’ accumulates and remains locked-up.

 

In traditional software development, there is no concept of interim releases to the customer. Some teams might provision for a proof of concept or a prototype, but most often, they are only meant to work under ‘test conditions’, meaning they are not fit for deployment in real world. At best, they give a feel of what it likely to come out of the development lab at the end of a generally long development cycle. In that long cycle, it is possible that some requirements become obsolete, or get clubbed with some other requirements, or just get de-prioritized. In effect, a ‘BRUF’ approach often might end up the team with a software built to original specs, but unfortunately for them, the customer’s view of the world has changed while they were busy developing the software in isolation. So, the ‘effort’ that doesn’t add to ‘value’ also becomes part of an already bloated inventory of development costs. Mary and Tom Poppendieck have discussed the subject of ‘inventory’ in software development in great details in their seminal work on Lean Software Development. They have taken a much wider view of the inventory, while I have limited my discussion in this article only to the development costs.

 

When we use Agile practices, we work on a prioritized subset of requirements for each increment, and at the end of each such increment, we deliver a working software (not a prototype) to the customer. The customer is in immediate position to test-drive the delivery and come back what any necessary changes that could be incorporated in the very next increment. At the end of each such successful increment that delivers ‘value’ to the customer, it is possible for the development teams to realize their development costs, thereby resetting the inventory levels to zero before starting the next increment. I have discussed this scenario taking a near-real-life example in my featured paper “Applying Little’s Law to Agile Project Management – part 2”.

 

Conclusions

Agile software development is a radical approach to improve productivity in software development teams while improving the value delivered to the customer by using shorter delivery cycles (and a lot of engineering practices, though not discussed in this article). Using Agile practices, it is possible for the development organization to create ‘value’ for the customer and also manage its own inventory levels. This is true for ISVs, or services companies working for a customer. It is also equally applicable for start-ups that often work for a prolonged gestation period in a ‘stealth mode’ and their only performance metric during that phase being the notorious ‘cash burn rate’. In today’s tough economic times, virtually every firm is trying to reduce its cash cycles, and Agile software development just provides one more financial incentive by reducing the inventory and shortening the cash cycle. 

 

 

 

 